laochui199801@163.com

Department of news

Preparations for Generator Start-up

Our company has been engaged in the production and sales of generators for many years. The enterprise has strong strength and strong technical force. We strictly control the quality of production. At the same time, adhering to the integrity-based business policy, the product quality is reliable and the price is reasonable. Here is the preparation before starting the generator.
1. Check oil level, coolant level and fuel quantity of lubricating oil.
2. Check whether there is oil leakage or not in the pipes and joints of the oil supply, lubrication and cooling systems of diesel engines.
3. Check whether there are potential leakage hazards such as skin breakage in the electrical circuit, whether the electrical circuit of the grounding line is loose, and whether the connection between the unit and the foundation is firm.
4. If the ambient temperature is below zero, a certain proportion of antifreeze should be added to the radiator.
5. When a diesel generating unit starts or stops for a long time, it should start again. The air in the fuel system should be exhausted by hand pump first.
The above is about the preparation before starting the generator. I hope it will be helpful to you. We use advanced technology, sophisticated production, to ensure the quality of products and the interests of customers, get the unanimous approval of customers, welcome to call to consult and order products.

Contact Us

Contact: Ms. Polly Ji

Phone: 14769000378

Tel: 14769000378

Company: 腾龙公司怎么联系客服微信:7952161【官方】-意博电子科技(东莞)有限公司

Add: North of 25 kilometer,Weishi Load,Hanting District,Weifang City